A specialised technical programme designed to strengthen compliance with international HSE requirements and standards governing offshore Single Point Mooring installation projects in line with recognised engineering and regulatory best practice
5 Days – Advanced Level
In high-risk offshore environments, Single Point Mooring (SPM) systems represent one of the most safety-critical and environmentally sensitive elements of marine oil infrastructure. Any weakness in HSE governance during installation can result in severe operational, environmental, and reputational consequences.
This programme provides a structured framework for managing international HSE requirements in offshore SPM installation projects. It focuses on marine risk management, lifting and anchor handling safety, diving and ROV control measures, spill prevention strategies, and SIMOPS coordination, aligned with globally recognised regulatory and industry standards.